Romania – Roadworks – "Modernization of National Road No. 4 (DN4) between km 7+564 – km 11+715"- Design and Execution
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The objective of the contract is the preparation of the technical-economic documentation in the authorization stage of the execution of the works (DTAC), technical design (PT) and execution details (DE), certified verification of the quality requirements of the project, technical assistance from the designer and the execution of the following objects: - Widening DN4 - Rainwater drainage - Public lighting The necessary steps to complete the investment are given by: Stage I - Elaboration of the technical documentation consisting in the elaboration of the technical documentation necessary to obtain the approvals /