2026-0413 Property planning service for outdoor area planning, FÖS Alfred-Adler-Schule, Franz-Lenze-Str. 97a, 47178 Duisburg 2026-0413 Property planning service for outdoor area planning, FÖS Alfred-Adler-Schule, Franz-Lenze-Str. 97a, 47178 Duisburg
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
2026-0413 Property planning service for outdoor area planning, FÖS Alfred-Adler-Schule, Franz-Lenze-Str. 97a, 47178 Duisburg 2026-0413 Property planning service for outdoor area planning, FÖS Alfred-Adler-Schule, Franz-Lenze-Str. 97a, 47178 Duisburg
The client has been commissioned by the city of Duisburg, among other things, to create additional spatial capacities for open all-day care at primary schools in the area of the city of Duisburg. This capacity expansion is taking place against the background of the future legal right to an open all-day place for primary school children. As part of this program, extension buildings are being built at 15 school locations, which are to be built as extensions, conversions or as solitary buildings. The extension buildings usually contain care rooms for open all-day activities, as well as adjoining rooms, a kitchen and a cafeteria. In addition, additional classrooms will be built at individual locations. An extension to the existing school building is planned at the FÖS Alfred-Adler location relevant to this tender. The extension is planned as a two-story new building that includes a cafeteria and a kitchen as well as additional rooms. In addition, care rooms for open all-day events and additional classrooms are being planned. The gross floor area should be around 1,030 m2. Clearing work must be carried out in advance of the measure. An expansion of the schoolyard areas is also to be carried out. After the extension has been constructed, the areas adjacent to the new building will be worked on and the open areas will be closed again. System construction methods or (partial) prefabricated construction methods are conceivable as possible planning and construction concepts in the sense of timely completion and should be evaluated for economic applicability in the course of the further planning phase.
Related Procurement Opportunities
Similar tenders in Architecture and Urban Development, Construction materials, Real Estate