TC Dock Structural Repairs
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The Government requires structural repairs to the existing TC Dock structures at Joint Base Lindsey Graham to return the facilities to a condition that supports safe operations. The project is Design-Bid Build. The work consists of a Base Bid and three Bid options. Base Bid includes:
- Underdeck repair of concrete elements (spalls, cracks, and other defects) requiring work overwater in confined spaces subject to daily tidal fluctuations.
- Repair of existing timber piles by installation of fiberglass jackets.
- Structural upgrades to North Ramp 5 and North Ramp 5 Extension, including demolition of existing concrete deck to access and strengthen pile caps with cast-in-place concrete, followed by in-kind replacement of the concrete deck.
Bid Option 1: Drainage upgrades to the Original TC Dock and North Dock Extension, including demolition of existing concrete deck and construction of a new, thicker cast-in-place concrete deck Bid Option 2: Replacement of a broken square concrete batter pile at the outboard face of Bent 111. Work includes demolition of the remaining pile and pile cap above water, driving a new square concrete batter pile, and construction of a new cast-in-place pile cap. Bid Option 3: Reutilization of an outboard batter pile at Bent 135 that has detached from the pile cap. Work includes demolition of the existing concrete pile cap and construction of a new extended cast-in-place pile cap to reconnect the pile.