Get Free Access
TZ Ref No.: TZ-11CB970
Tender Notice Live Notice National (NCB) Philippines Building Infrastructure and construction Education and Training

Improvement of School Building - Tagbakin Elementary School, Tiaong, Quezon

Doc ref no. 1332•••
Sector Building, Infrastructure and construction, Education and Training
Publish Date 30 Oct 2026
Estimated Value PHP 678K
Tender Intelligence
Qualification analysis + key highlights for this procurement

TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Description & Project Overview

B.5 Project Billboard/Signboard Quantity: 5.76 sq.m Materials: Ord. Plywood # 1/2 x 4 x 8 2.00 pcs Coco Lumber (2 x 3 x 8) 5.00 pcs Tarpaulin (8' x 8') 1.00 unit Assorted CWN 1.00 kls Labor: 1 Carpenter 0.50 day1 Laborer 0.50 day B.7 Occupational Safety & Health Program Quantity: 1.00 lot Materials: Safety Helmet 6.00 pcs Hand Gloves 6.00 pair Safety Shoes 6.00 pair Miscellaneous Items 1.00 lot (Medicine, Medicine Cabinet, Water, First-Aid Kit) SPL-1 Masonry Works Quantity: 40.00 sq.m Materials: Cement 50.00 pcs Sand 5.00 cu.m Gravel 3/4 2.00 cu.m CHB #4 500.00 pcs RSB 10mm 50.00 pcs White Sand 6.00 pcs Tie Wire #16 5.00 kgs Consumables (5% of Materials) 1.00 lot Labor: 1 Construction Foreman 7.00 day 2 Skilled Worker 7.00 day 2 Laborer 7.00 day Equipments: 1 Minor Tools (10% of Labor Cost) 1.00 lot SPL-2 Roofing Works Quantity: 1.00 l.s Materials: 2" x 4" x 1/4" Channel Bar 20.00 pcs 2" x 3" x 1.2mm C-Purlins 22.00 pcs 2" x 6" x 1.2mm C-Purlins 2.00 pcs 2" x 2" x 3/16" Angle Bar 5.00 pcs Fascia Board (1 x 10") 4.00 pcs Rib Type Roofing Long Span (0.5 mm) 60.00 l.m Pre-painted Ridge Cap (0.5 mm) 2.00 pcs Prepainted Flashing (0.5mm) 11.00 pcs Insulation 10mm 1.00 rolls Tekscrew 2" 650.00 pcs Welding Rod 3.00 box Cut-off Disk 2.00 pcs Cutting Disk 30.00 pcs Grinding Disk 5.00 pcs Vulcaseal 1.00 gal Consumables 1.00 lot Labor: 1 Construction Foreman 10.00 day 3 Skilled Worker 10.00 day 3 Laborer 10.00 day Equipment: 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003 Ceiling Works Quantity: 53.00 sq.m Materials: Metal Furring 45.00 pcs Carrying Channel 15.00 pcs Wall Angle 25.00 pcs W-clip 400.00 pcs 2" x 2" x 1.2 mm Tubular 5.00 pcs Ficem Board 20.00 pcs Cutting Disk 3.00 box Grinding Disk 2.00 box Cut-off Disk 1.00 pcs Diamond Blade 1.00 pcs Concrete Nail 1" 3.00 kgs Blind Rivet 5/32" 3.00 box Hardie Screw 1" 2.00 pack Screw Bit 5.00 pcs Drill Bit Metal 5/32 5.00 pcs Drill Bit Masonry 5/32 5.00 pcs Consumables (5% of Materials) 1.00 lot Labor: 1 Construction Foreman 3.00 day 3 Skilled Worker 3.00 day 3 Laborer 3.00 day Equipment: 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032 Paint Works Quantity: 1.00 lot Materials: Flat Latex 3.00 tin Semi-Gloss Paint 2.00 tin Gypsum Putty 1.00 tin Epoxy Adhesive 1.00 gal Sand Paper #120 25.00 pcs Sand Paper #101 25.00 pcs Paint Roller 4.00 pcs Paint Brush 2" 4.00 pcs Masking Tape 10.00 pcs Epoxy Primer 2.00 gal Lacquer Thinner 4.00 gal Baby Roller 4.00 pcs Brush 4.00 pcs Consumables (5% of Materials) 1.00 lot Labor: 1 Foreman 3.00 day 2 Skilled Worker 3.00 day 2 Laborer 3.00 day Equipment: 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018 Tile Works Quantity: 44.00 sq.m Materials: 60 cm x 60 cm Floor Tiles 125.00 pcs Tile Adhesive 15.00 bags Tile Spacer 1.00 pack Tile Grout 5.00 bags Consumables (5% of Materials) 1.00 lot Labor: 1 Construction Foreman 5.00 day 3 Skilled Worker 5.00 day 2 Laborer 5.00 day Equipments: 1 Minor Tools (10% of Labor Cost) 1.00 lot SPL-5 Doors & Windows Quantity: 1.00 l.s Materials: Aluminum Sliding Window 1.2m x 1.2m 4.00 pcs Panel Door with Door Jamb (1.0m x 2.10 m) 1.00 pcs Hinges #4 3.00 pcs Door Knob 1.00 pcs Consumables (5% of Materials) 1.00 lot Labor: 1 Construction Foreman 4.00 day 1 Skilled Worker 4.00 day 1 Laborer 4.00 day Equipments: 1 Minor Tools (10% of Labor Cost) 1.00 lot SPL-8 Electrical Works Quantity: 1.00 l.s Materials: Electrical Wire THHN/THWN #12 1.00 box Electrical Wire THHN/THWN #14 2.00 box Electrical Tape 10.00 pcs Flourescent Lamp 10.00 pcs Switch - 2 gang 1.00 pcs Outlet - 2 gang 4.00 pcs Flexible Hose 1/2" 4.00 roll Clamp 1/2" 4.00 pack Junction Box 20.00 pcs Consumables (5% of Materials) 1.00 lot Labor: 1 Construction Foreman 2.00 day 2 Skilled Worker 2.00 day 2 Laborer 2.00 day Equipment: 1 Minor Tools (10% of Labor Cost) 1.00 lot Delivery / Contract Period: 35 Day/s

Days to Deadline
11 days
Closing: 16 Nov 2026, 10:00
Register to Bid Check Bid Capacity
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Procurement Details

Doc ref no. 1332•••
Notice Type Tender Notice
Bidding Type NCB
Publish Date 30 Oct 2026
Sector Building, Infrastructure and construction, Education and Training
Bid Security Sign in to view
Funding Government of the Philippines (GOP)

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →