Jette A-1 Replaced Air Controls - HVAC
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The existing air units date from construction in the early 1980s. The concept at the time provided for 100% fresh air with a very limited return. Given the changes in legislation, the recent Covid problems and the energetically outdated concept, these groups are being replaced by air groups with a heat wheel. The file includes the preparation of implementation plans and technical sheets, the preparation of the necessary technical calculations and the installation and commissioning of the approved materials. This assignment concerns the renewal of the air units of building A, level 1 in Jette.