Germany – Demolition, site preparation and clearance work – Berlin TXL - UTR - 1.BA - Dismantling of the taxiway bridge and ramps
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
As part of the preparatory measures for construction, the so-called taxiway bridge is to be dismantled on the airport site within the first construction phase (demolition and construction site clearance). After the taxiway bridge superstructure has already been partially dismantled, the measure advertised here is to completely dismantle the remaining structure including the adjacent ramps. In the interests of sustainable site development, the largest possible portion of the existing material to be demolished is intended to be reused as recycled building material.