Construction of a Children’s Reception Structure with 56 Places and the Development of a Fun Outdoor Area
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The object of this assignment is the execution of the works necessary for the construction of a childcare structure with 56 places and the construction of the adjacent outdoor areas. The works include in particular the preparatory works, earthworks, foundations, shell, building envelope, finishes, special techniques, fixed equipment, environmental construction and all services necessary for the complete execution of the construction work in accordance with the contract documents. The building is intended for a childcare structure that meets applicable functional, technical, regulatory and safety requirements. The outdoor areas are constructed with play areas, relaxation areas, paths, plants and the equipment necessary for the proper functioning of the site. The assignment will be carried out in accordance with the provisions of these specifications, the plans, the technical documents and all documents that form part of the assignment file. The presentation is based on the execution of the necessary construction of the structure of the small capacity of the 56 places, based on the design of the exterior spaces. The complete set of preparations, the terraces, the foundations, the large body of work, the envelope of the bâtiment, the parachèvements, the special techniques, the fixed equipment, the aborders and the ensemble of the necessary preparations for the realization of the ouvrage, conformément aux documents du marché. Le bâtiment is determined by a structure d'accueil de la petite enfance répondant aux exigences fonctionnelles, techniques, réglementaires et de sécurité applicables. The exterior spaces are made up of the airways of the youth, the spaces of the détente, the cheminements, the plantations and the equipment needed for the site. The march is carried out in conformity with the clauses of the present charge sheet, with plans, with document techniques and with the ensemble d