Implementation of Bess systems in 2 urban buildings
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The order includes the design, supply, installation, connection and full commissioning of battery energy storage systems (BESS) for buildings of Stad Halle. The installations include the necessary adjustments to the electrical panels and cabling, protections, an energy management system, monitoring and possible grid disconnection. The contractor is also responsible for the required network studies and coordination with the distribution network operator, inspections, tests, training, technical documentation and maintenance. The systems must be delivered as one safe, reliable and ready-to-use whole and comply with the AREI, the applicable Belgian and European standards and the regulations of the grid operator.