Order: Brno, Tučkova – sewerage and water supply reconstruction, Stage I (Sušilova – Sokolská section)
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the construction works is the reconstruction of the sewerage and water supply in Tučkova Street, in the section between Sokolská and Sushilova Streets. The sewage drain from 1926 is in a state of disrepair in this section and it is necessary to carry out work on its replacement. The sewer drain will be replaced with a DN 500/750 profile and a length of 143.16 m. The sewer connections will be reconstructed with a total length of 133.42 m. The water line from 1925 will be replaced with a DN 100 profile with a length of 139.13 m and water connections with a total length of 121.80 m. After the work on the underground networks, communication areas will be restored. More detailed information about the execution of the construction can be found in the project documentation prepared by Sterplan a.s. in November 2025. Place of performance: Brno Procedure regime: mimo režim ZZVZ Awarded to: Skanska a.s. Awarded contract value: 25,419,237.17 CZK