Terminal 1, stay concept of the future – drywall work Terminal 1, stay concept of the future – drywall work
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Terminal 1, stay concept of the future – drywall work Terminal 1, stay concept of the future – drywall work
The renovation work covers the entire departure level of Terminal 1 and is located entirely in the aviation security area of the terminal. The conversion is to be implemented in sections during ongoing flight operations. The existing catering areas are not part of the new planning. The coordinated sequence of individual steps must be adhered to in order not to disrupt daily passenger traffic. The seating will be replaced in sections. Another striking feature of the new stay concept will be a “Rhine” floor covering that guides visitors through the entire terminal. The theme of greenery is carried out through trees and planters arranged in the terminal. Furthermore, theme walls are planned in the star-shaped parts of the building, each of which is intended to present topics about Cologne or Bonn. Drywall work - cladding ventilation towers The existing terminal ventilation in the C-star will be clad with drywall shaft cladding and wooden slats. For this purpose, the existing outlets are extended to the new construction. Additionally, new gate signage will be installed on these walls and padded seating described above will be placed around the structure.
Related Procurement Opportunities
Similar tenders in Construction materials, Industry, Architecture and Urban Development