SPGK_Construction services Gößnitz - Crimmitschau LOT 1 - Main construction services
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
SPGK_Construction services Gößnitz - Crimmitschau LOT 1 - Main construction services
Superstructure, civil engineering, cable civil engineering - Superstructure: 14,200 m of tracks, - Civil engineering: 87,000/ 92,000 m² Produce planum (PSS/FSS) - Production of route drainage - Cable civil engineering 15,000 m of cable container systems, civil engineering Renewal of 6 railway overpasses - EÜ Merlacher Straße (reinforced concrete half frame, clear width 4.0 m, width approx. 57.40 m, clear height 1.90 m, (sectional construction during closure breaks)) - EÜ Schmöllner Straße (reinforced concrete half frame, clear width 6.0 m, width approx. 53.60 m, clear height 2.80 m; 2 staircases and elevator shafts; connection to existing stair and ramp system (sectional construction during closure breaks)) - EÜ Bahnhofstraße (rolled beams in concrete, clear width 17.0 m, width approx. 12.16 m, clear height 4.50 m, WL in end position, side insertion superstructure) - EÜ Gistige (full reinforced concrete frame, clear width 7.95 m, width approx. 11.10 m, clear height 2.45 m (manufacture in end position)) - EÜ Paradiesbach (Reinforced concrete half frame, clear width 10.30 m (at right angles), width approx. 11.42 m, clear height 3.30 m, (half-sided production in end position)) - EÜ Breitscheidstrasse (rolled beam in concrete, clear width 13.0 m, width approx. 11.10 m, clear height 4.50 m, WL in end position, side insertion Superstructure) Retaining walls: - 1 retaining wall on the left of the railway, approx. 54 m - 3 retaining walls on the right of the railway, approx. 141 m Passages: - Dismantling/new construction of a total of 13 passages Noise barriers: - 5 pieces, 415 m with a height of 5.0 m, 430 m with a height of 4.0 m (including 240 m on the retaining wall) Building construction / platform systems - Demolition of 2 buildings during closure breaks - dismantling of old platforms - new construction of 2 platforms (conventional) including equipment and equipment (weather protection houses) implementation planning and surveying services construction while maintaining single-track, electric railway operations.
Related Procurement Opportunities
Similar tenders in Construction materials, Infrastructure and construction, Industry