Slovakia – Construction work for water and sewage pipelines – Viničky - Kráľovský Chlmec - Intensification of the supply pipeline II. stage
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The subject of the contract is the reconstruction of 1,672 m of water supply pipe according to the project documentation outside the built-up area between the villages of Viničky and Ladmovce on the right bank of the Bodrog watercourse. Basic part DN 500 (PN10) – ductile cast iron with a length of 1,645 m; at the crossing point of the Bodrog dam, in the section of km 1.645 – 1.672, an inserted HDPE pipe DN/OD 450 x 26.7 (PN10) is proposed in a length of 27 m to the existing DN 500 with tightness and anchoring; functional connections are also included - water connection HDPE D63 x 3.8 (PN10) in length 21 m and connection HDPE D160 x 9.5 (PN10) in length 8 m. Listed