80 residential municipal tenements general development 80 residential municipal tenements general development
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
80 residential municipal tenements general development 80 residential municipal tenements general development
CURRENT OF THE CONTROL: Construction of a residential building (new construction) with a floor area of 80 db and a unit of 1 db for the holding of Community events under the contract of lease. Summary description of the works to be carried out: The building to be constructed with a building with a basement area of a deep garage and storage space connected to a building of a building, with a ground floor of a A - a unit with a level of 6 db, with floor area + 1 dba - a building containing a building for the hosting of Community activities, and a building consisting of a floor space of a garden with a total floor area with a maximum of 6 floors.The parking spaces and public parking spacing for self-service units shall be located in a deep garage open on the ground floor, with 5 db electric accelerator and 2 db parking space provided for in a seamless manner. The front of the building has a partially thermal insulating clearance system and a partial layer of sand covering. The whole building complies with the requirements of the near zero energy building. 2 dv 1000/13 kg main passenger capacity is also provided.m2. - Waterproof vertical work area bounded by a smooth deep-building method (which includes a work area border) with a floor-mounted floor structure with a diameter of 80 cm and floor-soliding ground-mounting with a ground-soil submersion of 650 m3 and floor floor-to-basement ground-to‐basement consolidation with a bottom-soiling submergence of 700 m3 (soil-tobasement submersions: a total of 1350 m3) with a surface area of 11.351 m3. - The floor of the building below the ground-water level of the measurement shall be completed at 3,63 m and the floor-top area completed at 467,73 m2 + 621,55 m2 = 1089,282 m2 shall be maintained on the external surface of the floor with a permanent water-to-, iron-soiled structure - The building must be secured with a structural steel structure.with a monolithic iron-plated base plate with a wall-pillar-base structure of monolithian iron-pill, with a vacuum-filled roof and prefabricated system-flating over the openings, containing the quantity of all load-bearing iron-concrete structures: 6,314,1 m3. - 8 db fire-fighting data for architecture and building design and building performance in accordance with fire safety requirements in the building. The detailed description and quantity for the construction project shall be given in the DOC, which forms part of the procurement document, and which shall be posted in the ECRAC.The contracting authority also allows the bidding of equivalent products under Regulation (EC) No 321/2015 of 30 July 2015 (X. 30). Therefore, where the production, type or origin specified in the unpaid budget (and in any procurement document) is indicated, the term or equivalent should be used.
Related Procurement Opportunities
Similar tenders in Construction materials, Infrastructure and construction, Real Estate