reconstruction of station tracks and switches in ŽST Strakonice - ZL No. 1 - 8
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the order is the execution of additional construction works on six construction objects (SO) and the design of traffic measures, based on the additional requirements of the South Bohemian Region's ŘSD. For SO 102 Železniční spodek, based on the geotechnical assessment of the excavated soil at ŽST Strakonice, it is recommended to use material of the nature of clay gravel for the construction of the reinforced earth body, as the excavated soil is not suitable in terms of grain size. Within SO 110 Železniční most at km 272.536, a reinforced concrete sump is being removed. The additional construction work at SO 101 Železniční svršek is caused by the fact that the current state of the railway top of tracks No. 7, 9 will not allow the proposed system of security devices in the tracks to function without failure, and it is also not possible to connect the existing track fields to the newly implemented state. As part of SO 103.1 Island platform No. 1, it is about ensuring safe boarding and alighting for trains on the Plzeň - České Budějovice - Jihlava - Brno branch, including the possibility of their operational crossing at ŽST Strakonice, and then ensuring safe access to trains in the direction of Volary and Březnice. Place of performance: Praha Contract type: Stavební práce