Ventilation technology, CCM, building 2660 Ventilation technology, CCM, building 2660
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Ventilation technology, CCM, building 2660 Ventilation technology, CCM, building 2660
The Charité - Universitätsmedizin Berlin, Campus Charité Mitte (CCM) is putting the ventilation technology out to tender as part of the renovation of the Aschheim Zondek House. The service consists, among other things: consisting of: 1 piece supply air device, volume flow 1,700 m³/h 1 piece exhaust air device, volume flow 1,700 m³/h 1 piece hydraulic station 2 pieces weather protection grille in pitched roof design 210 m² air line rectangular steel, folded edge L 80 m² fitting air line rectangular steel folded 217 m Spiral folding pipe, zinc-plated steel, 45 pieces. Elbow, 90 degrees, zinc-plated steel, 29 m. Air line, round, flexible, 8 pieces. Constant volume flow controller, 16 pieces. Volume flow controller; const.; DN 100 16 pieces silencer; around; DN 100 40 pieces air valve exhaust air; 217 m thermal insulation air cable 150 m² thermal insulation air cable edge L up to 500mm building 90 m cold insulation jacket pipe DN25 30 m pipe for air conditioning cold water DN 25 There are special requirements according to the Berlin Tendering and Procurement Act (BerlAVG), see tender documents. Further information can be found in the documents provided on the Charité procurement platform (https://vergabeplattform.charite.de).
Related Procurement Opportunities
Similar tenders in Construction materials, Engineering, Architecture and Urban Development