Acquisition of a concrete modular shelter for the Auvere power plant
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
As part of this tender, one mobile concrete temporary shelter of the Auvere power plant will be purchased in compliance with the basic tender documents and applicable legal regulations. It is a mobile facility consisting of prefabricated reinforced concrete modules, which is intended for the protection of people in a dangerous situation. The scope of work includes (but is not limited to) transportation of the shelter, unloading and installation at the site prepared by the contractor, documentation of the shelter, training of the contractor. Lots note: The tenderer sets a deadline of 5 working days for the submission of tenders, as the technical requirements and volumes of the concrete shelter, which is the subject of the tender, are clearly defined and the preparation of the tender does not require extensive preparation. Also, the implementation of the procurement is urgent to ensure the timely completion of the object. Therefore, the procurer considers a deadline of 5 working days to be reasonable and proportionate within the meaning of § 152¹ subsection 2 of the RHS. The tenderer sets a deadline of 5 working days for the submission of tenders, as the technical requirements and volumes of the concrete shelter, which is the subject of the tender, are clearly defined and the preparation of the tender does not require extensive preparation. Also, the implementation of the procurement is urgent to ensure the timely completion of the object. Therefore, the procurer considers a deadline of 5 working days to be reasonable and proportionate within the meaning of § 152¹ subsection 2 of the RHS.