Saarbrücken converter plant, renovation for own use including AP
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The converter plant (Ufw) in Neu-Ulm currently houses the medium-voltage (MS), low-voltage (LV) and on-site systems for converters E1 and E2, as well as a municipal utility feed-in (not yet integrated) and the uninterruptible power supply system (UPS). These systems ensure the power supply of the traction current converter's own systems and the operating building. The supply cables from the transformer station (municipal utility feed-in, 10 kV) to the converter's own use have already been laid, but are only connected on one side.
The aim of renewing the in-house systems is to ensure the long-term operational reliability of the converters and the security of the traction power supply. The planned conversion is made more difficult by the fact that one of the two machines must always remain in operation. The existing cable and busbar systems should continue to be used if possible. The connection of the low-voltage main distribution to the local energy supplier and the connection of the new solar system to be built must be planned again.