Get Free Access
TZ Ref No.: TZ-26-1681787
Request for Information Live Notice National (NCB) Canada Renewable Energy Consultancy

Kingsway Green Energy Corridor Phase 2 Feasibility Study

Doc ref no. RFI •••
Sector Renewable Energy, Consultancy
Publish Date 12 Nov 2026
Estimated Value CAD ••••••
Tender Intelligence
Qualification analysis + key highlights for this procurement

TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Description & Project Overview

The City of Port Coquitlam (the “City”) is seeking information from qualified engineering consultants, technology providers, and other organizations with demonstrated experience in anaerobic digestion (AD) to inform the Phase 2 Kingsway Green Energy Corridor Feasibility Study. The City initially identified the opportunity to develop a District Energy System (DES) along the Kingsway corridor between Downtown Port Coquitlam and the Mary Hill Bypass. This concept would be implemented in two phases: Phase 1: A low temperature DES based on wastewater heat that would feed an identified localized City-owned facility to start Phase 2: A Regional Resource Recovery Centre (R3C) based on anaerobic digestion that could produce high-grade heat for industrial consumers along Kingsway or support another beneficial end use (Biogas, RNG, CHP, etc.) (Approx.

50,000 tonnes/year dried bio-solids/food waste) The proposed R3C may incorporate anaerobic digestion of municipal, industrial, commercial, and institutional (ICI) organic feedstocks to produce biogas, offset greenhouse gas (GHG) emissions, and support local renewable energy production. The resulting biogas may be used for renewable natural gas (RNG) production, combined heat and power, direct thermal use, or another end use. The City will also consider opportunities for the beneficial management and use of digestate and other process residuals.

Days to Deadline
32 days
Closing: 17 Dec 2026, 15:00
Register to Bid Check Bid Capacity
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Procurement Details

Doc ref no. RFI •••
Notice Type Request for Information
Bidding Type NCB
Publish Date 12 Nov 2026
Sector Renewable Energy, Consultancy
Bid Security Sign in to view

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →