VEB displacements B10 / B - BKP 287 construction cleaning
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Brief description The central infrastructure at Zurich Airport is being gradually modernized. Over the past 15 years, central areas have been extensively overhauled: Dock B was completely redesigned, Terminal 2 was fundamentally renovated and expanded, and a new security control center was built between Terminals 1 and 2 with direct access to the Airside Center. Furthermore, the baggage sorting system north of Terminal 1 and the entire baggage sorting system were renewed. The next step is to replace those infrastructure elements that have aged significantly. Dock A, including the tower, dates from 1985 and remains structurally almost unchanged. In terms of functionality, environmental standards and construction quality, it no longer meets current requirements. A comprehensive review led to the decision to replace the current Dock A with a new building to the north of the existing building. The planned new Dock A, the future tower and the completely renovated apron, together with other infrastructural adjustments, form the central structural projects for the next 15 to 20 years. The implementation will take place in stages - under the premise that flight operations continue to run smoothly and the newly created facilities meet future operational requirements. Following on from the above-mentioned matter, the project VEB Verdrängung B10 / B (PA19AA572 VPK 25-06-007) deals with the new construction and expansion of the VIP / EDA lounge, which is now located under the Airside Center at Dockroot A. The new location is on the south side of Terminal 2 on floors 1 and 2 and offers VIP guests a direct connection to the specialist processes. A new staff access to the airside will also be created, this will replace the staff access in dock root A. Short description of the advertised work Short description of the advertised work Maintenance cleaning of the construction site. Rough construction cleaning during the construction period,