Romania – Drinking-water treatment plant construction work – CL 4 - Design and execution of the water treatment plant and the water supply networks of the Big Island of Brailei – UAT Marasu and UAT Frecatei, the hypochlorite production facility in GA Ianca and the catchment front in STAP Victoria
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The object of the contract is the design and execution of new construction works and extensions to the following objectives: the construction of the Water Treatment Station in Marasu town, adductions and distribution networks in UAT Marasu, adduction STAP Marasu-Salcia water utility, the extension of the drinking water pipeline to Frecatei, with a section of the pipeline up to the Titcov water utility, works in the Salcia and Titcov water utilities, the realization of a hypochlorite production facilities located in GA Ianca, extension of the catchment front from STAP Victoria, ce