Austria – Construction work for railways and cable transport systems – Bludenz; Adaptation of the exit towards Arlberg; Construction - master builder work, main construction work
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The subject of the award is the construction work for the construction of a double-track section with an increased curve radius at the exit from Bludenz train station in the direction of Arlberg from km 133.900 to km 135.100 in order to increase the permissible speed from 70 km/h to 100 km/h over a length of approximately one kilometer and thus an increase in the practical entry and exit speed to 100 km/h in Bludenz train station approx. 1.1 km long. The main construction work will take place in the area km 133,946 to km 135,123. In addition, in the area of Bf. Braz and Bf. Bludenz from km