Fundamental expansion of Wallrothstrasse with static slope protection as well as new construction of a shared walking/cycle path in 99734 Nordhausen; 2nd construction phase
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The city of Nordhausen is thoroughly expanding Wallrothstrasse. The measure will be carried out in several construction phases. In the first construction phase (station 0-085 to 0+340), the expansion including a new rainwater canal has already been completed. With this procedure, the construction work for the 2nd construction phase from construction km 0+340 to construction km 0+508 will be put out to tender (listed as LOT-0001 in point 5 of this announcement). In this section the road runs on a pronounced slope. The embankment on the valley side is not stable; Stability is achieved via three engineering structures, which form the focus of the measure: - an intersected bored pile wall from station 0+400 to 0+508, length approx. 108 m, developed wall area approx. 1,350 m², large bored piles according to DIN EN 1536 with D = 88 cm, anchored back with 29 micropiles according to DIN EN 14199; on it head beam and cap made of reinforced concrete, - an angle retaining wall made of prefabricated reinforced concrete parts from station 0+420 to 0+508, length approx. 90 m, - Slope stabilization in reinforced earth with geogrids from station 0+340 to 0+400. In addition, there is the thorough road expansion including surface drainage, a shared footpath and cycle path that runs in sections over the cap of the bored pile wall, a crossing aid with ground indicators, street lighting and the adaptation of the mountain-side forest path. Special boundary conditions for execution: - The construction area is suspected of having explosive weapons; Probing is required before earthworks and drilling work. - Under the existing roadway there is a layer contaminated with polycyclic aromatic hydrocarbons. Guideline C 316 and TRGS 551 apply to their expansion. - A medium-voltage line run by the local network operator runs in the construction site and must be secured during the construction period. - Tree felling and clearing work is subject to the obligation in accordance with Section 39 Paragraph 5 BNatSchG and is only permitted outside the period from March 1st to September 30th. - The working level for the bored pile work is the existing roadway with a paved width of around 5.65 m. The construction project will be carried out in three separate phases: - Section 1: Tree felling and woody work, January 18, 2027 to February 28, 2027. - Section 2.1: Main construction project, 03/2027 to 12/2027. - Section 2.2: Completion of the main construction project, 04/2028 to 06/2028. Work is suspended between Section 1 and Section 2.1. The winter break between Section 2.1 and Section 2.2 is from December 18, 2027. There are no plans to divide the service advertised here into further lots.
Related Procurement Opportunities
Similar tenders in Engineering, Roads and Highways, Infrastructure and construction