46005.10 / 593-02 Electrical engineer, PJZ expansion UPS, data center (TIER 4) UPS
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
593-02 Electrical engineer Subject The Canton of Zurich Construction Directorate, represented by the Building Construction Office, is organizing a tender on behalf of the Directorate of Justice and Interior for the award of electrical planning services and overall management (project planning, tendering and implementation) for the expansion of the uninterruptible power supply of the data center (approaching Tier 4 standard) in the Zurich Police and Justice Center (PJZ). We are looking for a planner for services in the area of electrical building technology and overall management with construction management with extensive experience in the implementation of conversions in the area of police buildings or similarly complex organizational units. The project planning must be carried out with a high level of construction and organizational competence and a high sensitivity to the existing structure. The construction project must be carried out in a cost- and quality-conscious manner and on time. All work must be coordinated and carried out in the context of ongoing operations. Further planning services (structural work, HVAC, fire protection) are commissioned directly by the building authority, but also run under the overall management of the electrical planner. Initial situation The PJZ houses a data center for the cantonal police and the IT office. There are currently no redundant UPS systems for this data center and the carrier rooms. A UPS system was implemented in the data center during the new construction phase. The requirement for Tier 4 did not yet exist at the time of creation, as no data center was initially to be built in the PJZ, only IT rooms. Therefore, the supply principle was designed only to meet these needs. As part of two feasibility studies in April 2026, it was clarified how redundancy of the UPS systems could be achieved in order to improve operational stability and reliability in accordance with the Tier 4 standard for data centers (without this actually being the case).