Debris Boom Supply and Install at Harry S. Truman Lake Project
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Debris Boom Supply and Install at Harry S. Truman Lake Project
The purpose of the debris boom is to prevent floating debris from impacting the dams tainter gates, which is crucial for maintaining the full operational capacity of the spillway. the boom will also serve as a visual barrier to boaters. the contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to furnish a complete debris boom system at harry s. truman dam. the approximately 2,000-foot boom shall be designed to intercept floating debris upstream of the spillway and withstand site-specific hydraulic, wind, wave, debris, and impact loading conditions. the debris boom shall be designed for an 800-foot-long by 3-foot-thick debris field, use a minimum safety factor of 2.0 for design loads, withstand a direct head-on impact from an 18-inch-diameter, 100-foot-long log traveling at the maximum design water velocity, and withstand design conditions including 50 mph wind speed and 5-foot wave height.
this acquisition is not set-aside for small business concerns and is competed as full and open competition, unrestricted.
an organized site visit has been scheduled for: friday, 9 october 2026 at 11am.
Related Procurement Opportunities
Similar tenders in Construction materials, Environment And Pollution, Infrastructure and construction