Work to bring these installations into conformity in order to comply with the requirements requested in the order relating to the operation of the installation classified for environmental protection.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Work to bring these installations into conformity in order to comply with the requirements requested in the order relating to the operation of the installation classified for environmental protection. As part of the operation of the Eure forms site, HAROPA PORT | Le Havre must carry out work to bring these installations into compliance in order to comply with the requirements requested in the prefectural decree relating to the operation of the installation classified for the protection of the environment of the refit site. The work concerns the treatment of rainwater and fairing water, including associated electrical work (low currents and high currents) and more particularly: - The overhaul of the supply and evacuation network, - The replacement of the compressed air network, which is obsolete and which will be positioned in the same trenches, - The installation of water treatment stations with sludge traps/oil separators, - The creation on the site of two fairing areas for units not requiring formal entry (certain pontoons, small boats from the Access and Maritime Environment service).