Project management for the creation of a storage basin and restitution of 25,000 m3, crossings of the Seine and the doubling of an outfall Project management for the creation of a storage basin and restitution of 25,000 m3, crossings of the Seine...
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Project management for the creation of a storage basin and restitution of 25,000 m3, crossings of the Seine and the doubling of an outfall Project management for the creation of a storage basin and restitution of 25,000 m3, crossings of the Seine and the doubling of an outfall
The main object of the contract concerns the work necessary to move towards compliance with the Émeraude collection system, as well as securing the transfer of effluent from the right bank to the left bank. The works of this contract are as follows: - Creation of a storage and restitution basin of 25,000 m3 (named Pasteur basin) located at the Jean-de-Verrazane garden on the right bank of Rouen, including technical room (screening, pumping, deodorization), and connections to the associated networks; - Creation of a crossing of the Seine located to the right of the future Pasteur basin over a length of approximately 340m (depending on the location of the wells) to be connected on the right bank to the basin and to be connected on the left bank to the two outfalls; - Creation of a crossing of the Seine located near the William the Conqueror bridge in Rouen over a length of approximately 320m, including wells, technical room on the right bank and associated connection networks. This “GLC” crossing includes one or two sanitation pipes and two AEP pipes. On the left bank, connections are planned on the existing Siphon connections; - Completion of phase 2 of the doubling of the outfall over a length depending on the routes of 2.2 to 3.3km, its connection to the Émeraude STEP and the associated lifting system. The services are divided into 1 firm tranche and 3 optional tranches detailed in the consultation regulations.
Related Procurement Opportunities
Similar tenders in Construction materials, Infrastructure and construction, Water and Sanitation