France – Electrical installation work – NEUILLY-SUR-MARNE PLANT: SECURING THE WATER INTAKE
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
This consultation concerns the work to secure the water intake of the drinking water production plant in Neuilly-sur-Marne (93), on behalf of the Syndicat des Eaux d'Ile-de-France. The Neuilly-sur-Marne plant, with a nominal production capacity of 600,000 m3/day, is supplied by a water intake on the left bank of the Marne. The work of lot n°1 concerns the renewal of the hydraulic, process, electricity-automation and civil engineering equipment of the Water Intake functional unit. The work of lot no. 2 concerns the replacement and modification of fences and
Related Procurement Opportunities
Similar tenders in Energy, Power and Electrical