Germany – Catenary's construction works – ABS Hanau Gelnhausen: Overhead line work PfA 5.16
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
According to the Federal Transport Infrastructure Plan, the existing route 3600 between Hanau and Gelnhausen is to be expanded from a 2- or 3-track route to a 4-track route. Due to the VAST and BAST, the aim is to expand the route to a route speed of 230 km/h. In order to achieve a line speed of 230 km/h, the overhead line system (OLA) must be manufactured according to the Re250 design. The second planning approval section 5.16, which is advertised here, is in the Niedermittlau area (km 38.6 - km 42.2). In terms of overhead lines, the OLA will be phased in gradually