Freelance services - B 247 Ferna and Teistungen bypass; Planning-accompanying measurement
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The Ferna-Teistungen bypass has been in the planning approval process since 2016. During this process, plan change documents were already submitted in 2018 and 2020, but these were not satisfactory, so the need for a third plan change was communicated in 2022. Due to the now outdated surveying data as well as changed professional and technical requirements, a comprehensive update of the existing survey is necessary.
The existing existing documents no longer adequately reflect the current local conditions and the level of detail required for advanced design planning. In order to ensure further planning that is technically, environmentally and economically sound, a new, comprehensive inventory measurement is required to accompany the planning. This should capture the current topographical and structural conditions completely and with the position and height accuracy necessary for design planning and create a consistent data basis for the update of all affected specialist planning. It is therefore an essential prerequisite for the coordinated integration of traffic, drainage, environmental and construction planning requirements as well as for further quality-assured planning of the B 247 OU Ferna-Teistungen.