Demolition of a residential building at ul. Saint Barbara 3 in Wałbrzych (plot no. 43, 28 Sobięcin) in accordance with the attached design documentation.
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Demolition of a residential building at ul. Saint Barbara 3 in Wałbrzych (plot no. 43, 28 Sobięcin) in accordance with the attached design documentation. Order completion date: 6 weeks Warranty period: not applicable Offer validity period: 30 days Place of offer submission: TENDER PLATFORM https://gminawalbrzych.logintrade.net/registration/przetargi.html ATTENTION!!! THE OFFER SHOULD BE ATTACHED WITH A SIGNED UOBN STATEMENT Scope of work: Demolition of a residential building at ul. Saint Barbara 3 in Wałbrzych (plot no. 43, r. 28 Sobięcin) Cleaning the square after demolition works, removal of demolition materials and removal of garbage accumulated in the building and next to the building, leveling the ground after the demolished building. A layer of topsoil should be fertilized and spread. Additionally: o Construction works should be carried out under the supervision of persons meeting the requirements of Art. 12(7) of the Construction Law. After completion of the works, a statement from the works manager must be submitted that the works were carried out in accordance with the regulations and construction practice. o We are in the process of obtaining an ornithological and chiropterological opinion. o The price should also include the removal of waste accumulated in the building and next to the building. o The Ordering Party allows demolition to be carried out using mechanical equipment, provided that during the work, the Contractor will respect the interests of the parties and third parties, as well as health and safety and fire protection conditions. o After completing the demolition, the Contractor will tidy up the area, provide an as-built surveying inventory with an updated master map, and confirmation of waste transfer. o ALL UTILITIES TO THE BUILDING WILL BE CUT OFF BEFORE THE AGREEMENT IS SIGNED. The contractor is obliged to inspect the valued facility, taking into account all circumstances affecting the value of the offer. Estimated method of settlement of works: LUMP SUM Details of items No. Subject of the order CPV/Index Quantity Unit Attachment Comments 1. Demolition of a residential building at ul. Saint Barbara 3 in Wałbrzych (plot