Krounka, Kutřín, polder construction Krounka, Kutřín, polder construction
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Krounka, Kutřín, polder construction Krounka, Kutřín, polder construction
Completion of the work already under construction Krounk, Kutřín, construction of the polder. The work consists in building a dry retention reservoir (polder) of Kutřín. The construction of the dam body is designed as a concrete gravity dam. The total length of the dam is approx. 146 m (including the spillway of the safety overflow), the maximum height of the dam above the ground is 17.80 m, the total width of the crown of the dam is 5.67 m. Part of the body of the dam is a functional object with two lower outlets and a migration passage. As a safety object, a lateral safety spillway with a length of 25 m of the spillway edge is proposed, located at the right-bank tie-off of the dam with a subsequent slip from the spillway, which ends with a weir. The safety spillway is designed to safely transfer a Q10000 control flood (106 m3/s).
Related Procurement Opportunities
Similar tenders in Construction materials, Infrastructure and construction, Engineering