Get Free Access
TZ Ref No.: TZ-1111697
Contract Award Awarded Contract 🌍 International (ICB) Bulgaria Infrastructure and construction Railways Construction materials

Design and construction of a section of the third metro line from Shipka Street, through the Slatina district, to Tsarigradsko Shose Boulevard with six metro stations as separate items Design and construction of a metro section from km 0+000.00...

Doc ref no. 00659488-2026
Sector Infrastructure and construction, Railways, Construction materials
Contract Date 27 Sep 2026
Contract Value Undisclosed
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Contract Description

Design and construction of a section of the third metro line from Shipka Street, through the Slatina district, to Tsarigradsko Shose Boulevard with six metro stations as separate items Design and construction of a metro section from km 0+000.00 to km 1+904.00 with two underground metro stations /MS1 and MS2/ and an inter-station ventilation facility
The metro section is 1904 m long. MS1 has a length of 142 m and a gross built-up area (GBA) of 6636.60 sq m. MS2 has a length of 120 m and a GBA of 5097.00 sq m. The ventilation shaft (VS) has clear plan dimensions of 8.80 m x 30.00 m. MS1 is located at the intersection of Geo Milev St. and Cherkovna St. with Sitnyakovo Blvd. Under Sitnyakovo Blvd. there is an existing underpass, which is partially demolished to provide access to the MS1 vestibule. MS2 is located under Geo Milev St. immediately next to the intersection with N. Copernicus St. The metro stations are monolithic reinforced concrete structures. MS1 provides for a traction substation, and MS2 - a substation. The working design, construction, supply of necessary equipment, commissioning tests, and commissioning must be executed in the following parts: Geological and hydrogeological surveys; Alignment, profile, and alignment plan; Geodesy; Architecture; Structures; Track; Contact network – mechanical and electrical part; Electrical systems and installations; Water supply and sewerage (WSS); Heating, ventilation, and air conditioning (HVAC); Automation and telemechanics; Specialized low-voltage and audiovisual systems; Passenger control and fare collection system; Health and Safety Plan (HSP) with temporary traffic organization; Reconstruction of infrastructure within the scope of construction; Vertical planning and landscaping; Fire safety

Days to Deadline
68 days
Closing: 24 Dec 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 00659488-2026
Notice Type Contract Award
Contract CPV 45234116, 29813000, 14100000
Contract Project Location Bulgaria
Contract Value Undisclosed
Contract Date 27 Sep 2026
Contract Deadline 24 Dec 2026

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →