Emergency heating boiler including chimney for the district heating power plant at the Winterthur waste recycling plant
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Production of the three most important main components: boiler, burner and chimney Compilation of the individual parts including the associated control system Delivery on site with installation / installation using a pneumatic crane on the steel frame in the planned building extension of the district heating plant Finished assembly of the individual parts including commissioning Further details see document SW Part 4 A in the tender documents