SR Power Supplies Rack Detailed Design for ALS-U
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
SR Power Supplies Rack Detailed Design for ALS-U
This rfp has been revised 10/1/26 to extend the proposal due date until monday october 19, 2026.
all other terms and conditions of this rfp remain the same.
______________________________________________________________________
this rfp has been revised 9/25/26 to include a questions & clarifications (qa) document no. 4.
all other terms and conditions of this rfp remain the same.
______________________________________________________________________
this rfp has been revised 9/23/26 to include a questions & clarifications (qa) document no. 3.
all other terms and conditions of this rfp remain the same.
______________________________________________________________________
this rfp has been revised 9/22/26 to include a questions & clarifications (qa) document no. 2.
all other terms and conditions of this rfp remain the same.
______________________________________________________________________
this rfp has been revised 9/20/26 to include a questions & clarifications (qa) document.
all other terms and conditions of this rfp remain the same.
______________________________________________________________________
dear prospective offeror,
the university of california, on behalf of the lawrence berkeley national laboratory (lbnl), would like to invite you to participate in request for proposal (rfp) no. aa-2027-01 for als-u storage ring power supplies rack designs.
the rfp and associated documents (listed below) are attached hereto:
0. rfp and proposal preparation instructions
1. statement of work; inclusive of all referenced documents.
please view the following google drive for complete technical documentation:
https://drive.google.com/drive/u/0/folders/1lvlqphc5on3uki29zgcj63htsmv-znuj
2. sample subcontract
3. als-u quality evaluation survey (required with submission)
4. rep cert form (required with submission)
timeline of events:
questions for clarification - no later than september 24, 2026
pre-proposal conference - week of september 28, 2026, if necessary
submissions due - no later than october 2, 2026.
Related Procurement Opportunities
Similar tenders in Industrial Automation and Control