Get Free Access
TZ Ref No.: TZ-1124264
Contract Award Awarded Contract 🌍 International (ICB) Romania Construction materials Infrastructure and construction Engineering

Execution of works within the Calea lui Traian Urban Rehabilitation project Default lot

Doc ref no. 00660980-2026
Sector Construction materials, Infrastructure and construction, Engineering
Contract Date 30 Sep 2026
Contract Value Undisclosed
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Contract Description

Execution of works within the Calea lui Traian Urban Rehabilitation project Default lot
The studied location is situated in the Calea lui Traian area over a length of approx. 7.5 km, in accordance with GD 54/2008, which crosses the city from S-N from the Traffic Entrance (southern limit) in accordance withHCL 189/2013, up to Valea Bujorencii (northern limit) according to HCL 33/1994, and includes the areas adjacent to the street on the left and right: sidewalks, public spaces, squares, parks, the public spaces inthe interior of residential housing complexes and condominium-type housing areas. The works that are the subject of this project fall under category C - Constructions of importancenormal – in accordance with Government Decision no. 766/1997 Regulation on establishing the importance category of constructions and with the Methodology for establishing the importance category of constructions,elaborated by INCERC, SCB-BAP laboratory in April 1996. Areas of intervention surfaces: - Sidewalk: The area of the existing sidewalk on which intervention works are proposed is 30,153.1 sq m; -Parking: The area of the existing parking lots subject to intervention is 13,963 sqm; - Green spaces: The area of the existing green spaces subject to intervention is approximately 30,000 sqm. ELEMENTS OFINFRASTRUCTURE 1. Calea lui Traian: Pedestrian surfaces (sidewalks); Car parking surfaces (parking lots) 2. Strada Florilor: Pedestrian surfaces (sidewalks) 3. Strada Bogdan Amaru: SurfacesPedestrian areas (sidewalks); Car parking areas (parking lots) 4. Mihai Eminescu Street: Pedestrian areas (sidewalks); Car parking areas (parking lots) 5. Eleodor Constantinescu Entrance:Pedestrian surfaces (sidewalks); Car parking surfaces (parking lots) 6. 1 Mai Street: Pedestrian surfaces (sidewalks) 7. Dacia Street: Pedestrian surfaces (sidewalks) 8. Dorin Chirita Alley(Olanesti): Pedestrian surfaces (sidewalks) 9. Splaiul Independentei: Pedestrian surfaces (sidewalks); Car parking surfaces (parking lots) 10. Strada General Magheru: Pedestrian surfaces (sidewalks);Car parking areas (parking lots) 11. Splaiul Independentei: Pedestrian areas (sidewalks) 12. Strada Stirbei Voda: Pedestrian areas (sidewalks) 13. Splaiul Independentei: Pedestrian areas(sidewalks) 14. Tudor Vladimirescu Blvd: Pedestrian areas (sidewalks) 15. Capitan Maraseanu Street: Pedestrian areas (sidewalks) 16. Capitan Negoescu Street: Pedestrian areas (sidewalks) 17.Constantin Brancoveanu Street: Pedestrian surfaces (sidewalks) 18. Nicolae Balcescu Boulevard: Pedestrian surfaces (sidewalks) 19. Tudor Vladimirescu Blvd.: Pedestrian surfaces (sidewalks); Surfaces ofstationary auto (parking) 20. Carol I Street: Pedestrian surfaces (sidewalks); Auto parking surfaces (parking) 21. Danil Ionescu Street: Pedestrian surfaces (sidewalks) 22. Matei Basarab Street:Pedestrian surfaces (sidewalks) 23. Radu de la Afumati Street: Pedestrian surfaces (sidewalks); Car parking surfaces (parking lots) 24. Republicii Street: Pedestrian surfaces (sidewalks) 25. StreetLiviu Rebreanu: Pedestrian surfaces (sidewalks) 26. Zefirului Street: Pedestrian surfaces (sidewalks) 27. Professor Sergiu Purece Alley: Pedestrian surfaces (sidewalks) 28. Dealu Malului Street:Pedestrian surfaces (sidewalks) 29. Campului Street: Pedestrian surfaces (sidewalks) 30. Timis Street: Pedestrian surfaces (sidewalks) 31. Carpati Street: Pedestrian surfaces (sidewalks) 32. Somes Street:Pedestrian surfaces (sidewalks) The works are detailed in the technical execution project. Reference points defined by the Beneficiary: a) Reference point no. 1 – Completion in 30 daysfrom the Commencement Date, as stated in the Administrative Commencement Order, and implies the fulfilment of the following indicators: - The Contractors key personnel is mobilised; -The Detailed Execution Programme of the entire contract consisting of a works scheduling chart (on paper and in editable electronic format) and a descriptive report shall be submittedTo the Site Manager, for analysis and acceptance; - The Site Logbook is drawn up by the Contractor, in the format approved by the Site Manager; - The Contractors Laboratory isinsured in accordance with the Specifications (at least one temporarily insured); - The Traffic Management Plan is approved by the Site Managers and the Beneficiary; - The panelsTo the Constructor, regarding the Investment Objective (panels for displaying the characteristics of the works, according to A.C.) are installed. b) Reference point no. 2 - Execution within 90 days fromStart Date as mentioned in the Administrative Order to Start and assumes the Achievement of the following indicators: - The indicators defined at Reference Point no. 1 arefulfilled; - The Contractors Site Organization is completed and functional; - The Contractors machinery, equipment, human, technical and material resources are mobilized in stagesin accordance with the Execution Programme accepted by the Site Manager; - The Quality Management Plan is approved by the Site Manager and implemented; - The inventorythe completion regarding utilities have been finalized and the detailed report has been forwarded to the Site Manager. The definition of the other two Reference Points will be carried out by the Beneficiary togetherwith the Site Manager and shall be submitted to the Contractor within 30 days from the date of acceptance by the Site Manager of the Contractors Execution Programme which shall becomethus the Reference Programme.

Days to Deadline
68 days
Closing: 25 Dec 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 00660980-2026
Notice Type Contract Award
Contract CPV 14100000, 45000000, 74200000
Contract Project Location Romania
Contract Value Undisclosed
Contract Date 30 Sep 2026
Contract Deadline 25 Dec 2026

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →