Get Free Access
TZ Ref No.: TZ-1159278

Construction of one (1) storey – two (2) classroom school building, (with common toilet) modified standard dpwh-dep.ed design, tup-0n elem. school

Doc ref no. -
Sector Construction materials, Education and Training, Infrastructure and construction
Publish Date 08 Oct 2026
Estimated Value PHP 7.0M
Tender Intelligence
Qualification analysis + key highlights for this procurement

TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Description & Project Overview

Invitation to Bid (ITB):Construction of one (1) storey – two (2) classroom school building, (with common toilet) modified standard dpwh-dep.ed design, tup-0n elem. school
Item no.---------------qty------------------unit-------------------item 1------------------------2----------------------month-----------------temporary facilities 2------------------------1----------------------lot----------------------fire safety inspection certificates (fsic) 3------------------------3----------------------each--------------------project billboard 4-----------------------2-----------------------month-----------------occupational safety and health 5-----------------------2-----------------------month-----------------mobilization and demobilization 6----------------------215.65-----------------sq.m-------------------clearing and grubbing 7----------------------83.50------------------cu.m-------------------structure excavation (common soil) 8----------------------13.74-------------------cu.m------------------embankment (from structure excavation) 9----------------------21.66-------------------cu.m------------------gravel fill 10--------------------87.11-------------------cu.m------------------embankment 11--------------------11.3--------------------liters------------------soil poising 12--------------------34.27-----------------cu.m-------------------structural concrete (footing & slab on fill) 13--------------------13.33-----------------cu.m-------------------structural concrete (footing tie beam, column, suspended slab, girder/beam) 14--------------------0.68------------------cu.m--------------------ramp on fill 15--------------------5,346.31-------------kgs.--------------------reinforcing steel bar, grade 40 16--------------------206.72---------------sq.m-------------------installation & removal of formworks 17--------------------53.3------------------sq.m-------------------masonry (100 mm chb) 18-------------------152.36-----------------sq.m-------------------masonry (150 mm chb) 19-------------------369.57----------------sq.m-------------------plain cement plaster finish 20-------------------158.76----------------sq.m-------------------plain cement floor plaster 21-------------------2.52--------------------sq.m-------------------hollow core flush door 22-------------------8.64--------------------sq.m-------------------wooden panel door 23-------------------26.32------------------sq.m--------------------jalouise window (glass) 24--------------------8-----------------------sq.m-------------------frames (jambs, sill, head, transoms, & mullions 25--------------------1------------------------ls----------------------ramp rail 26--------------------1,767.12---------------kg.--------------------structural steel roof truss 29------------------2,711.1---------------- kgs.-----------------------structural steel purlins 30------------------380.1-------------------kgs.-----------------------metal structure accessories (steel plates) 31------------------48------------------------pcs.----------------------metal structure accessories (anchor) 32------------------88------------------------pcs.-----------------------metal structure accessories (sag rods) 33-------------------16-----------------------pcs.-----------------------metal structure accessories (turnbuckle) 34-------------------169.56-----------------kgs.-----------------------metal structure accessories (cross bracing) 35-------------------196.08-----------------sq.m.---------------------pre-painted meta

Days to Deadline
9 days
Closing: 27 Oct 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Procurement Details

Doc ref no. -
Notice Type Tender Notice
Bidding Type N/A
Publish Date 08 Oct 2026
Sector Construction materials, Education and Training, Infrastructure and construction
Document Fee Available in full notice
Bid Security Refer to documents
Funding Government Budget
Bid Opening Locked

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →