Description & Project Overview
Elering AS procures 330kV, 220kV and 110kV wall bushings for installations under construction and as reserve equipment according to the conditions stated in the basic documents of the public procurement. Lots note: The public procurement is not divided into parts, because the buildings where the given equipment will be installed are decided on the basis of a standard project, and therefore all delivered equipment must have a uniform technical solution and dimensions, in case of procurement of equipment from different suppliers, it may not be possible to solve the buildings to be built on the basis of a standard project, because the principles of the arrangement of the equipment, space requirements may differ between suppliers. The start date of the procurement contract in the public procurement general data is indicative and non-binding (execution of the procurement contract starts from the date of conclusion of the procurement contract).
The state procurement is not divided into parts, because the buildings where the given equipment will be installed are decided on the basis of a standard design, and therefore all delivered equipment must have a uniform technical solution and dimensions, in the case of obtaining equipment from different suppliers, it may not be possible to solve the buildings to be built on the basis of a standard design, since the principles of the arrangement of the equipment, space requirements may differ between suppliers. The start date of the procurement contract in the public procurement general data is indicative and non-binding (execution of the procurement contract starts from the date of conclusion of the procurement contract).