Germany – Ventilation and air-conditioning installation work – Air conditioning systems, house 2
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Installation of ventilation systems; Installation of a supply and exhaust air device with HRG with a volume flow of 12,000m³/h on the flat roof, installation of a small ventilation system with an exhaust fan of 180m³/h in the battery room in the basement. Assembly of approx. 750m of round air pipe DN100 to DN280 and approx. 1,000m² of ducts including fittings up to an edge length of 1,000mm, as well as insulation work. Installation of approx. 32 fire dampers. Production of core drillings and breakthroughs required for RLT. Approximately 200 poppet valves, associated silencers and regulators for constant volume flow.