Germany – Construction work for oil and gas pipelines – Auxiliary procedure for obtaining offers_AUS_Pipelinebau_SPO_Los1_Nord
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Terranets bw GmbH (terranets bw) is planning a future-proof expansion of its existing natural gas network. the “Spessart-Odenwald Line (SPO)”. The planned natural gas transport pipeline with a total length of approximately 117 kilometers runs through the federal state of Hesse and the Free State of Bavaria. It has a nominal diameter of DN 1,000 and a pressure rating of PN 90. Fiber optic cables for data transmission, operational remote control and other communication should be laid in a cable protection tube at the 2 o'clock position. The standard coverage of the pipes is 1.2 m; in the area of