Design, supply and installation of Isanova substation 220 kV
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Specific Procurement Notice Request for Bids Plant Design, Supply and Installation (Two-envelope Bidding Process, Without Prequalification) Employer : Ministry of Energy of the Kyrgyz Republic Project: Kyrgyz Renewable Energy Development (KRED) Phase 1 Contract title : Design, Supply, Installation, Testing and Commissioning of the 220/110/10 kV "Isanova" Substation and Associated 110/35/10 kV Substation Extensions (Kara Shoro, Karatay and Kara Kuldzha), including Associated Transmission Line Connection and Interface Works Country: Kyrgyz Republic Loan No. /Credit No. / Grant No.: 7370-KG / F 3790- G RFB No: KG/KRED/W/2023/RFB-04 Issued on: October 27, 2026 1. The Government of the Kyrgyz Republic has received financing from the World Bank toward the cost of the Kyrgyz Renewable Energy Development Project (KRED) and intends to apply part of the proceeds toward payments under the Contract for Design, Supply, Installation, Testing and Commissioning of the 220/110/10 kV “Isanova” Substation and Associated 110/35/10 kV Substation Extensions (Kara Shoro, Karatay and Kara Kuldzha), including Associated Transmission Line Connection and Interface Works. 2. The Ministry of Energy of the Kyrgyz Republic, through its Project Management Office (PMO), now invites sealed Bids from eligible Bidders for the Design, Supply, Installation, Testing and Commissioning of the 220/110/10 kV “Isanova” Substation and Associated 110/35/10 kV Substation Extensions, including Associated Transmission Line Connection and Interface Works, under a single lump-sum Design, Supply and Installation (DSI) Contract. 3. Bidding will be conducted through international competitive procurement using a Request for Bids (RFB), Single-Stage, Two-Envelope procedure, as specified in the World Bank Procurement Regulations for IPF Borrowers, Fifth Edition, September 2023 (the “Procurement Regulations”) and is open to all eligible Bidders as defined in the Procurement Regulations. In addition, please refer to the Procurement Regulations setting forth the World Bank’s policy on conflict of interest. 4. Interested eligible Bidders may obtain further information from the Project Management Office (PMO), Ministry of Energy of the Kyrgyz Republic, Attn.: Mr. Gulzhigit Murzakarimov, Director, E-mail: kred.pmo@gmail.com, and inspect the bidding documents during office hours from 09:00 to 17:00 hours (Bishkek Time) at the address given below. 5. The bidding document in English may be obtained free of charge by inte