Project management for the overall restructuring of the “Les EPONTOTS” college in MONTCENIS (71) Project management for the overall restructuring of the “Les EPONTOTS” college in MONTCENIS (71)
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Project management for the overall restructuring of the “Les EPONTOTS” college in MONTCENIS (71) Project management for the overall restructuring of the “Les EPONTOTS” college in MONTCENIS (71)
Project management for the overall restructuring of the “Les EPONTOTS” college in MONTCENIS (71) Including the following basic missions: Summary preliminary project studies (APS) Final preliminary project studies (APD) including establishment and submission of the building permit PRO project studies Execution and summary studies EXE Design Assistance to the project owner for the award of public works contracts – Submission of the complete DCE AMT1 Assistance to the project owner for the award of public works contracts - Analysis of offers AMT2 Execution and summary studies EXE Realization Direction of the execution of works contracts DET Assistance to the project owner during acceptance operations AOR Reception Assistance to the project owner during acceptance operations AOR GPA, and the following additional missions: Preliminary studies mission EP Scheduling, management and coordination of the site OPC Additional mission of assistance with commissioning GPA+ Mission to coordinate the SSI fire safety system Support mission for the environmental quality of QEB buildings Product Equipment Materials Waste PEMD Photovoltaic Mission. The submission of offers is subject to a visit to the places of execution of the contract according to the conditions indicated in article 4.4 of the consultation regulations. The contract will start on the date of notification and will end on the date guaranteed for perfect completion of the work or after extension of this period if the reservations indicated upon receipt of the work are not all lifted at the end of this period.
Related Procurement Opportunities
Similar tenders in Education and Training, Construction materials, Architecture and Urban Development