Study and support assignment for the urban development and environmental regularization of a temporary depot for buses on the Delta site
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
La mission d'étude concerne les études suivantes : 1. Etude des solutions pour répondre aux besoins relatifs à l'aménagement du remisage provisoire des bus ; 2. Etablissement d'une demande de permit d'urbanisme (PU) intégrant les réponses aux complémentaires identifiés ; 3.
Etablissement de la demande de l'environnement (PE) relatif au remisage exterior provisoire et aux aménagements qui y sont liés ; 4. Etablir un Rapport d'Environnementale (RIE) nécessaire pour le PU et le PE; 5. Suivi et adaptation du dossier en vue de l'obtention des permis (PU et PE).
The study assignment includes the following studies: 1. Research into solutions to meet the needs regarding the design of the temporary parking area for buses; 2. Preparing the application for an urban development permit (SV), which includes the answers to the identified additional needs; 3.
Drawing up the application for an environmental permit (MV) with regard to the temporary outdoor depot and the associated facilities; 4. Prepare an environmental impact report (EIA) required for the SV and the MV; 5. Follow-up and adjustment of the file with a view to obtaining the permits (SV and MV).