Czechia – Office block construction work – New administrative center for Forests of the Czech Republic, s.p.
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The new building of the NAC LČR will have 2 underground and 2 above-ground floors. The underground floor of the building, the stair cores and the economic building in the place of the above-ground parking lot will be made of monolithic reinforced concrete. The above-ground parts of the main building will be constructed as a timber structure in a combination of three construction systems – two by four construction for the perimeter walls, reinforcing walls and partitions, a truss construction made of glued timber to carry large spans and CLT panels used for ceiling slabs. Collective garages, archives, storage and technical-technological spaces will be located within the underground floors