Major maintenance work and renovation of the metro platform - Phase 1 - 2027 campaign
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Major maintenance work and renovation of the metro platform - Phase 1 - Campaign 2027 The Rouen tramway network, commercially called the Rouen metro, was inaugurated in 1994. It has 2 lines and 31 stations for a platform length of 15.1 km. It crosses the city of Rouen from north to south, thus serving the left bank and the right bank of the city.
The metro is integrated into an urban and historic environment. The network has several tunnels. The longest, 1700 m, allows you to pass under the city center of Rouen.
Access to this tunnel with a road vehicle is impossible. Consequently, the HOLDER must provide adequate materials and equipment to carry out the services in the tunnel, and on the “wooden decking” of the Jeanne d’Arc bridge. Three other tunnels of shorter length are on the left bank. The track gauge is 1435 mm with a tolerance of -1/+1mm for straight or curves R>150 m, 1432.5 mm for curves between 80 and 150 m, and 1430 mm for curves R<= 80m Renewal of rails Reloading of rails