Austria – Construction works for power plants and heating plants – BM-FHKW Kufstein – heat pump
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Process engineering for the construction of a heat pump system in the Kufstein biomass cogeneration plant. The scope of delivery includes the installation of one or more compression heat pumps with a total heating output of approx. 5.4 MW to use the heat recovered from flue gas condensation. The system raises the temperature level of the heat obtained to a level that can be used by the district heating network. The scope of services includes the delivery, assembly and commissioning of the heat pump system including integration into the existing system technology.