Bulgaria – Cycle path construction work – "Completion of the existing bicycle lane along April Uprising Blvd., from Buzludzha St. to the intersection with Bulgaria Blvd. and from Strandzha Blvd. to Perister Business Zone under the project "Around the River Beli Lom" program "Development of the Regions 2021-2027"
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The completion of the existing bike lane including the first section from "Bulgaria" Blvd. to "Buzludzha" St. with a length of 76 m and the second section from "Strandja" Blvd. - connection with the existing bike lane to the end of Aprilsko Ustanie Blvd. - connection with the existing bike lane that reaches the town of "Pchelina". The length of the second section is 1237 m.