Germany – Prison building construction work – 26E Heating system and central water heating system
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
4 pellet boilers each 200 kW; 4 free-standing fireplaces. Height approx. 15 m; 2 pellet bunkers with sloping floors and screw discharge; 2 buffer tanks 20,000 L; 3 heat pumps 180-300kW; approx. 1,950 kg steel UK for the heat pumps Installation of approx. 8,134m of heating pipes (semi-stainless steel presses DN12-DN40) in the building Installation of approx. 3,561m of heating pipes (welded steel pipe DN50-DN150) in the building Installation of approx. 3,495 heating fittings and accessories Installation of 24 fresh water stations Installation of 8 buffer tanks 1000-4000L Installation of 19 plate heat exchangers 55-600kW Installation of approx. 17,545 m²