Order: Brno, Skořepka – relocation of the water supply
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the construction is the relocation of the water supply line. The existing DN300 public water main will be rerouted in the place of the existing TSB yard and in part of Skořepka Street. In the yard, the water supply will be transferred to the newly built extension of the collector, and then to the ground in Skořepka Street. The total length of the proposed water main diversion is 54.54 m. The length of the section in the collector will be 41.4 m. The water pipe will be made of ductile iron with a cement lining and external surface protection. The building is located on the premises of TSB, a.s. on Křenová Street 9 parcel number 1187/5 and on vacant parcel 1073/1 of the Trnitá cadastral territory and on Skořepka Street parcel number 1079/1. Place of performance: Brno Procedure regime: mimo režim ZZVZ Awarded to: VHT Vodohospodářské technologie s.r.o. Awarded contract value: 3,120,489.15 CZK