Czechia – Motorway construction works – D11 1109 Trutnov - state border of the Czech Republic/PR - Change No. 101.3
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Construction D11 1109 Trutnov state border CR/PR continues construction D11 1108 Jaroměř Trutnov at km 133,000 and ends at km 154,175. It is a four-lane highway with a total length of 21,175 meters. Thirteen larger bridges over the valley with a length of more than 100 meters are proposed on the route, including three large bridge structures: the 715-meter Poříčí bridge, the 670-meter bridge over the Ličná river valley and the 330-meter Lampertice bridge, as well as two tunnels Poříčí and Opevencije and three interchanges Střítež, Poříčí, Královec. At the border, the Czech highway will connect to the Polish expressway S3, leading across Poland to the Baltic Sea.