Germany – Electrical installation work – V26b Emission measurement (480), municipal energy utilization Swabia gKU, new construction of a sewage sludge drying facility with pyrolysis and administration building
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The planned building consists of halls for the sewage sludge upcycling plant and an administration building. The hall is an L-shaped structure with a total length of approx. 60 m and a width of approx. 40 m. The hall is on the ground floor. The northern part of the hall, in which deliveries are housed, has a partial basement. The hall will be constructed in reinforced concrete frame construction with a roof structure made of wooden trusses with sandwich panels. The total gross floor area of the hall is 1,642 m². In the southwest of the hall is the administration building, which is separated by a fire wall
Related Procurement Opportunities
Similar tenders in Building, Infrastructure and construction, Water and Sanitation